Stainless steel pipe making machine maintenance period table

Posted by: Hangao    Time:9/23/2025 8:30:59 AM

Daily Maintenance (Recommended Time: 30-45 Minutes)
1. Clean the forming rollers and welding electrodes

Cleaning Frequency: After the end of daily production

Data Reference: Maintaining a roller surface roughness Ra ≤ 0.8 μm can reduce weld rework by 12%

2. Lubricate the drive chain and bearings

Lubricant Amount: 3-5 ml per lubrication point

Data Reference: Proper lubrication can reduce transmission component wear by 20%

3. Check the cooling water circulation

Water temperature: Maintain 20-30°C

Water pressure: 0.2-0.3 MPa

Data Reference: A properly functioning cooling system can extend the life of the welding electrodes by 15%

Weekly Maintenance (Recommended Time: 1-1.5 Hours)
1. Measure the gap between the forming rollers

Gap tolerance: ±0.02 mm

Data Reference: A stable gap can keep the pipe ovality within 0.3%

2. Check electrical wiring and cooling system.

o Electrical contact resistance: ≤0.05 Ω

o Reference: Secure wiring can reduce electrical downtime by 8%.

3. Weld flaw detection inspection

o Inspection ratio: ≥5% per batch

o Reference: Prompt detection of defects can reduce the risk of batch scrap by 10%.

Monthly maintenance (recommended time: 3-4 hours)

1. Apply anti-rust oil to the machine frame and roller system.

o Anti-rust oil film thickness: 5-10 μm

o Reference: Anti-rust treatment can reduce roller corrosion by 25%.

2. Replace worn guide plates or scrapers.

o Wear limit: Replace when thickness decreases ≥10%.

o Reference: Timely replacement can improve forming stability by 18%.

3. Calibrate the accuracy of the in-line diameter gauge.

o Accuracy requirement: ±0.01 mm

o Reference: Accurate diameter measurement can reduce dimensional deviations. 15%

Annual Maintenance (Recommended Time: 1-2 Days)
1. Bearing and Motor Overhaul

Bearing Clearance: Meets Manufacturer's Standards

Data Reference: Annual Overhaul Can Extend Bearing Life by 20%

2. Drive System Disassembly, Cleaning, and Lubrication

Cleaning Agent: Neutral, Rust-Proof

Data Reference: Transmission Efficiency Increases by 5% After Cleaning

3. Safety Device Inspection

Emergency Stop Response Time: ≤0.5 Seconds

Data Reference: Safety Devices in Operation Reduce Accident Risk by 100%

4. Equipment Leveling

Level Deviation: ≤0.5 mm/m

Data Reference: Leveling Accuracy Can Reduce Equipment Vibration by 12%